Mavel Uzbekistan — Hydropower Turbines from 5 kW to 30 MW

Product range

Hydro turbines made in the Czech Republic, 5 kW – 30 MW. Complete equipment packages for rivers, dams and irrigation canals.

Official representative of Mavel, a.s. (Czech Republic) in Uzbekistan

Reliable machine for low heads
H 1.5 – 35 mQ 1.2 – 200 m³/sP 20 kW – 20 MW
Open
500+

turbines delivered worldwide

43

countries on five continents

1990

year the company was founded in the Czech Republic

5 kW – 30 MW

unit output range

Turbine selection

Head and flow determine the turbine type

Every site is described by two figures: the head and the flow. Hover over an area to see the turbine type, or find your site on the chart.

FrancisPeltonTM MicroKaplan10 kW100 kW1 MW10 MW0.11101001101001000Flow — m³/s (log)Head — m (log)

Tap an area to open the turbine

Kaplan

Reliable machine for low heads

Head
1.5 – 35 m
Flow
1.2 – 200 m³/s
Output
20 kW – 20 MW
Open

Scope of supply

One contract for all the equipment.

Mavel supplies the complete electro-mechanical package — designed, manufactured and tested in the Czech Republic.

  1. Hydraulic engineering

    Hydraulic design for the specific site; more than 100 proprietary runner designs; every unit adapted to your head and flow.

  2. In-house manufacturing

    Runners milled on 5- and 6-axis CNC centres from single forgings, in 12 900 m² of Czech production facilities.

  3. Generators & automation

    Generators, control systems and SCADA are integrated and tested at the factory. The plant operates without permanent staff.

  4. Installation & service

    Supervision, commissioning, operator training and spare parts — supported locally from Tashkent.

Concrete-lined irrigation canal carrying water at full flow
Vraj Acharya, WELL Labs / Wikimedia Commons / CC BY-SA 4.0

Why now

Most of the potential is still unused

Uzbekistan uses about a quarter of its annual hydropower potential of 27.5 TWh. The national programme targets 40% renewable electricity by 2030. Thousands of kilometres of irrigation canals are suitable sites for low-head turbines.

  • 27.5 TWh

    annual hydro potential — only ~27% utilized

  • 28 000 km

    of main irrigation canals across the country

  • 270+

    canal sites already identified for small hydro

  • 40%

    renewable electricity targeted by 2030

Do you have a site?

Send the head, the flow and the location. We will select the machine.

Write to us